Decking first, then a roof that lasts through hail.
Fort Worth. Wade Moss pulls a sheet before we shingle. Priya Nair puts you on the list.
Deck replacement
Plywood first. We do not nail through rot. 870 roofs. 14 years.
Architectural shingles
Laminates after the deck is true. Ice-and-water at the eaves.
Hail
Walk with the adjuster. Then the list.
Wade Moss and Priya Nair
2608 S Main St, Fort Worth, TX 76110. They replaced the rotten decking instead of nailing through it. The list was worth the wait. — Tanya G., Fairmount
Get on the list
(817) 555-0219 · list@decktrue.com · Mon–Fri 7–5