How we work
A call, a date that matches the last day of framing, then ice-and-water.1. Pick a window
Imani books to the framer's last day, not the week after.
2. Read the spec
Ice-and-water brand and felt weight named in the packet.
3. Deck is dry
Cal rolls the first house of the week himself. Then shingles when you say.
What we do
New construction. Ice-and-water, felt, then architectural shingles.
New-construction dry-in
Ice-and-water and felt on plywood decks so the framers can hang drywall.
Builder specs
We read the packet. Same underlayment the superintendent named.
Shingle after dry-in
Architectural shingles once the house is closed. 620 dry-ins. 12 years.
From Ankeny
They dried-in the spec house on a Thursday so we could hang drywall Friday. — Len M.
Schedule dry-in
1418 E 14th St, Des Moines, IA 50316 · Mon–Fri 6:30–16:30